| |
|
PEMEX Exploracion Bagre-C
• Located offshore Mexico in the PEP North Region Activo the Bagre-C platform
is a SEAHORSE III normally unmanned six slot well protector/oil production
platform located in 160’ w.d. The facility includes a control building and microturbine
power generation equipment.
• Facility Design Rates:
• 19,000 BOPD
• 11 MMSCFD
• 9,500 BWPD
• EPC Scope of Work:
• Project Management
• Engineering Scope of Work:
Process
Mechanical
Instrument
Electrical
Structural
3D CAD
• Procurement
• Construction Management
• Fabrication
Back to Worldwide Expereince |
 |
|
|